Main Contractor
GE – (USA) , Gama Power – (Turkey) Consortium
End User
Hatay-Erzin Power Plant
Location
Hatay / Turkey
Start Date
September, 2012
End Date
August, 2014Category
Installation testing, pre-commissioing and commissioning support works
Hatay-Erzin Power Plant (900MW Natural Gas Combined Cycle)
Erzin (CCGT) Power Plant is located in Erzin southeast of Turkey.
The plant is based on a multishaft configuration that comprises two gas turbines (209FB), steam turbine (MTD 60) and three generators (GE 330H), two horizontal heat recovery steam generators.
Gas turbines and generators by GE, steam turbine by Skoda, HRSG by Doosan.
Scope Of Works
Project scheduling and management
Installation, testing, pre-commissioing and support works
Manufacturing
- Process Pipe support fabrication